Masar Makkah

UMQ - Masar Destination Customize Canopy LED Screen

The Masar Destination Context

The canopy infrastructure is integrated directly into the heart of Masar Destination—a $10 billion, 1.2 million square meter landmark development. The core of this mega-project is its central pedestrian boulevard, which stretches 3.65 kilometers in length and is up to 320 meters wide.

This boulevard acts as a natural extension of the Holy Mosque plazas. It is designed to separate pedestrian mobility from vehicular traffic, providing safe, comfortable transit for pilgrims and visitors. The environment is powered by a state-of-the-art ICT network, transitioning a traditional walkway into an immersive, sensory-rich space that balances Makkah's authentic spiritual heritage with modern digital connectivity.

Delta’s Canopy Mesh Infrastructure

The canopy mesh screens represent a massive achievement in large-scale outdoor AV integration. Suspended above the pedestrian pathways, these LED displays serve a dual purpose: contributing to the environmental shading of the boulevard while delivering an expansive digital canvas.

The mesh architecture is specifically engineered for this scale to allow for proper wind flow and heat dissipation—crucial for Makkah's climate—while maintaining the brightness and pixel density required for high-resolution visual soundscapes and architectural lighting. This installation effectively turns the transit corridor into a dynamic, interactive experience for hundreds of thousands of pedestrians.

Operational Resilience and Site Management

Executing a project of this magnitude alongside a massive, multi-contractor urban development introduces significant infrastructure challenges, particularly regarding power stability.

The active installation sites have required rigorous oversight to protect the LED hardware from localized electrical instability. Managing this deployment has meant continuously navigating site-level power-spikes and unauthorized electrical cuts. Specifically, the operational shutdowns documented earlier this year on March 5th, March 14th, and May 5th highlighted the necessity of strict incident logging and adaptive site management. Overcoming these infrastructure hurdles is a testament to the resilience of the hardware and the active troubleshooting required to maintain uptime on a prominent mega-project.

Power in Numbers

28

Installation Days

284

Screens

1056

SQM